Required Inspection - Misc. Additions
I. Decks / Patio Arbors
- Setback
- Piers / Foundation
- Framing
- Electric
- Final
II. Fence
- String Line / Setback
- Final III. Accessory Building
- Setback
- Foundation
- Framing
- Electric
- Plumbing
- Final
IV. Pools
- Fencing or enclosure
- Layout
- Pool Bonding / Electrical Permit
- Steel
- Gas Rough
- Gas Appliance or Equipment
- Location
- Plumbing Rough
- Gas Final
- Deck Bonding
- Deck Steel
- Final
- Backflow prevention
V. Signs
- Setback
- Height
- Square Footage
- Illuminated? If yes, then electrical permit required.
| Print Friendly Format |
