Active City Projects

Below is a list of all major Capital Improvement Projects, both street and facility related.

16-inch Irrigation Water line. #5IB
This project will be from county road 152 to Airport road and Lakeway Drive.

2006 Street Overlays
Project completed in 2007.Completed streets in this project include Parker from Kathi to River Bend, Cotton-Wood Dr from River Bend to Ranch, Mesquite Ln. from Ranch to Parkway.

2007/2008 Street Rehabilitation Project
The City of Georgetown will be performing Street Rehabilitation projects in the following neighborhoods/streets in 2008: Thousand Oaks, Sierra Vista, San Gabriel Heights MLK, 10th & 15th Streets Northwest Blvd. Berry Creek, section 1 S. College, 16th, and 17th

4th Pump at Leander Pump Station
2020 Leander Road.

Austin Ave. Wastewater Improvements
Project completed summer, 2007. This project is located on Austin Avenue from Williams Drive to 21st Street.

Austin Ave. Water Improvements
Project completed summer, 2007. This project is located on Austin Avenue from Second Street to 21st Street.

Downtown Regional Water Quality Ponds
Project completed in 2007. Second and Main Street (Main Street Pond) and Second and College Street (VFW Park)

Escalera Elevated Water Storage Tank
644 Fm 2243

Main Street Reconstruction, University Ave. to Ninth St.
Project completed in 2007. Main Street utility line replacements and street re-engineering from University Avenue to Ninth Street.

Main Street Water/wastewater Rehabilitation
This project is on Main Street from University to 21st Street

Park Central Blvd reconstruction
Completed in 2007. Park Central Blvd from Westinghouse to Commerce

Park WTP Clearwell Project #2AV
W.L.Walden

Rabbit Hill Pump Station Improvements 2AE
980 CR 116 Georgetown

Rock Street Lift Station Removal
This project is located on Rock Street from Third street to San Sabriel Village.

San Gabriel WWTP Wet Weather & Irrigation Improvements
1101 North College Street

South Fork San Gabriel Wastewater Interceptor
This project is located on the South Fork of the San Gabriel River at Interstate 35.

South Fork San Gabriel Wastewater Interceptor Phase B & C
This project starts on the South San Gabriel River approximately 3000 feet west of IH 35 and continues approximately 33,000 LF.